Dams

Kralkızı Dam and HEPP

Dam body, spillway and powerhouse
Dam body, spillway and powerhouse
Location
Diyarbakır, Türkiye
Client
DSİ
Period
1985–1991
Service
Detailed design and consultancy
Key data
2 × 45 MW; spillway 3,547 m³/s

Scope

  • Powerhouse: 2 × 45 MW
  • Gated spillway: 3,547 m³/s
  • Diversion tunnels: Ø 5.50 m
  • Power tunnels: Ø 5.00 m
  • Power intake
  • Bottom outlet
  • Grouting and drainage galleries
  • Tailrace channel
  • Switchyard
  • Service roads: 18 km
  • Consultancy services during construction