| Raising of Ulaşlı and Hisarköy small damsOngoingBatman, Türkiye | Design | DSİ 10. Bölge | 2026– | |
|---|
| Raising of Yapıaltın DamOngoingSivas, Türkiye | Design | DSİ 19. Bölge | 2024– | |
|---|
| Çepni DamSivas, Türkiye | Design | DSİ | 2023 | |
|---|
| Kabakoz DamOngoingİstanbul, Türkiye | Design | DSİ | 2021– | Concrete-faced rockfill dam (CFRD), 58 m |
|---|
| Lower Aras Tuzluca DamOngoingIğdır, Türkiye | Detailed design | Hane Proje İnşaat | 2025– | |
|---|
| Completion of Ünlendi DamOngoingIğdır, Türkiye | Detailed design | Hane Proje İnşaat | | |
|---|
| İnişdibi debris flow barrierOngoing | Detailed design | Göksu Maden–Erat Yapı İş Ortaklığı | 2026– | |
|---|
| Raising of Germeçtepe DamOngoingKastamonu, Türkiye | Detailed design | Everest İnşaat | 2024– | |
|---|
| Completion of Çermik Kale DamDiyarbakır, Türkiye | Detailed design | Farsel–Adakale–Baykara İş Ortaklığı | 2023 | |
|---|
| Çates ash dam raising | Design and drilling investigations | Çates Elektrik Üretim | 2022 | |
|---|
| Yenişamlar Damİstanbul, Türkiye | Planning report | DSİ 14. Bölge | 2020 | |
|---|
| Şanlıurfa small dams, Parts 1 and 2Şanlıurfa, Türkiye | Technical report and design | DSİ 15. Bölge | 2016 | |
|---|
| İlhan DamAnkara, Türkiye | Design | DSİ | 2021–2023 | Concrete-faced rockfill dam (CFRD), 109 m; spillway 728.23 m³/s |
|---|
| Eymir DamSivas, Türkiye | Design | DSİ | 2017–2019 | Concrete-faced rockfill dam (CFRD), 58 m |
|---|
| Armağan DamSivas, Türkiye | Design | DSİ | 2017–2019 | Clay-core embankment dam, 34 m |
|---|
| Yırtmaçdere DamSakarya, Türkiye | Planning report | DSİ 14. Bölge | 2016 | |
|---|
| Gökbel DamAydın, Türkiye | Detailed design | | 2013–2020 | Concrete-faced rockfill dam (CFRD), 60 m |
|---|
| İhsaniye DamKocaeli, Türkiye | Final and detailed design | DSİ | 2013–2019 | Roller-compacted concrete (RCC) dam, 69 m |
|---|
| Avcıdere DamKocaeli, Türkiye | Design | DSİ | 2013–2015 | Concrete-faced rockfill dam (CFRD), 89.65 m |
|---|
| Salıpazarı DamSamsun, Türkiye | Design | DSİ | 2012–2015 | Roller-compacted concrete (RCC) dam, 69 m |
|---|
| Musacalı Damİzmir, Türkiye | Design | DSİ | 2013–2015 | Concrete-faced rockfill dam (CFRD), 79.5 m |
|---|
| Geyikli Damİzmir, Türkiye | Design | DSİ | 2013–2014 | Concrete-faced rockfill dam (CFRD), 74.5 m |
|---|
| Çay DamAfyonkarahisar, Türkiye | Design | | | Concrete-faced rockfill dam (CFRD), 106 m |
|---|
| Gördes Dam right bank ground improvement, Part 1Manisa, Türkiye | Design | | | 325,000 m² geomembrane and GCL lining |
|---|
| Yukarı Afrin DamKilis, Türkiye | Design | DSİ | 2011–2012 | Clay-core sand-gravel fill dam, 60 m |
|---|
| Uladı Damİzmir, Türkiye | Design | DSİ | 2010–2012 | Concrete-faced sand-gravel fill dam, 86 m |
|---|
| Akçakoca DamDüzce, Türkiye | Design | DSİ | 2010–2011 | Roller-compacted concrete (RCC) dam, 60 m |
|---|
| Kalecik DamAnkara, Türkiye | Design | DSİ | 2009–2011 | Clay-core earthfill dam, 75 m |
|---|
| Aydınca Dam, Yeşilöz weir and conveyance canalAmasya, Türkiye | Final design | DSİ | 2008–2009 | Concrete-faced rockfill dam (CFRD), 75 m |
|---|
| Silvan Dam and HEPPDiyarbakır, Türkiye | Final and detailed design | DSİ | 2006–2008 | Concrete-faced rockfill dam (CFRD), 185 m; 4 × 40 MW; spillway 5,346 m³/s |
|---|
| Cheliff Dam and pumping stationAlgeria | Detailed design | | 2006–2009 | |
|---|
| Gomaspan DamErbil, Iraq | Consultancy and supervision | | | Roller-compacted concrete (RCC) dam |
|---|
| Kuruçay DamAfyonkarahisar, Türkiye | Final and detailed design | DSİ | 2005–2007 | Clay-core earthfill dam, 32 m; spillway 94 m³/s |
|---|
| Murat DamAğrı, Türkiye | Final and detailed design | DSİ | 2004–2006 | Concrete-faced rockfill dam (CFRD), 96.5 m; spillway 1,294 m³/s |
|---|
| Gördes DamManisa, Türkiye | Detailed design | Koçoğlu İnşaat · DSİ | 2004–2010 | Concrete-faced rockfill dam (CFRD), 95 m; spillway 2,358 m³/s |
|---|
| Çaltıkoru Dam | Final and detailed design | Koçoğlu İnşaat · DSİ | 2004–2011 | Roller-compacted concrete (RCC) dam, 56 m; spillway 325 m³/s |
|---|
| Kavşakkaya Dam and transmission pipelineAnkara, Türkiye | Final and detailed design | DSİ 5. Bölge | 2000–2002 | Clay-core rockfill dam, 85 m; spillway 473 m³/s |
|---|
| Karacasu Dam | Detailed design | Limak İnşaat · DSİ | 1998–2011 | Spillway 1,390 m³/s |
|---|
| Çokal Dam | Detailed design | Ünaltur · DSİ | 1997–1998 | Spillway 2,400 m³/s |
|---|
| Karaçal Dam | Detailed design | DSİ | 1995–1997 | Spillway 435 m³/s |
|---|
| Karacalar Dam | Detailed design | Günsayıl İnşaat · DSİ | 1995–2006 | Spillway 780 m³/s |
|---|
| Koçhisar Dam | Detailed design | Günsayıl İnşaat · DSİ | 1995–2006 | Spillway 315 m³/s |
|---|
| Akgedik Dam | Detailed design | Günsayıl İnşaat · DSİ | 1995–2006 | Dam, 52 m |
|---|
| Orhaneli Thermal Power Plant ash dam | Final and detailed design | Muna İnşaat · TEK | 1987–1988 | Earthfill dam, 45 m |
|---|
| Gazibey Dam | Detailed design | Özdemir İnşaat · DSİ | 1987–1988 | Spillway 358 m³/s |
|---|
| İkizcetepeler Dam | Detailed design and consultancy | Mapa İnşaat · DSİ | 1986–1987 | Spillway 650 m³/s |
|---|
| Mumcular Dam | Detailed design | Kiska–Santa · DSİ | 1986–1987 | Spillway 600 m³/s |
|---|
| Çayboğazı Dam | Detailed design | Özdemir İnşaat · DSİ | 1986–1988 | Spillway 350 m³/s |
|---|
| Büyükorhan Dam | Detailed design | Aksu İnşaat · DSİ | 1985–1987 | Spillway 507.9 m³/s |
|---|
| Dumluca Dam | Detailed design | İçkale İnşaat · DSİ | 1985–1987 | Spillway 186.25 m³/s |
|---|
| Hancağız Dam | Detailed design | Kiska · DSİ | 1985–1988 | Spillway 1,500 m³/s |
|---|
| Hacıhıdır Dam | Detailed design | Onar–Günsayıl · DSİ | 1985–1988 | Spillway 650 m³/s |
|---|
| Kralkızı Dam and HEPPDiyarbakır, Türkiye | Detailed design and consultancy | DSİ | 1985–1991 | 2 × 45 MW; spillway 3,547 m³/s |
|---|
| Etibank Kef chrome concentrator water system and tailings dam | Final design | Boral · Etibank | 1984–1985 | Earthfill dam, 36 m |
|---|
| Kovalı Dam | Consultancy services | Özdemir İnşaat · DSİ | 1984–1985 | |
|---|
| Uzunlu Dam | Detailed design | Lider İnşaat · DSİ | 1983–1987 | Spillway 1,291 m³/s |
|---|