Duration : [1990~1990]
Owner/Contractor : SETAN +Development Bank of Turkey Cons.
Supply of Water from Wells (250 l/s)
Final and Detail Design of a 13 km Pipeline
Final and Detail Design of Water Network
Detail Design of a Reservoir (5000 m³)
Detail Design of a Surge Tank (500 m³)