Duration :[1997~1997]
Owner/Contractor : SETAN + ERKO Engineering Co.Ltd. + DSİ
Pipeline (1000 mm Dia, 12275 m Long)
Energy Dissipating Room at the End of the Pipeline
Related Pipeline Structures (Air Relief Valve Chambers, Drainage Chambers, Valve Chambers etc)