Duration : [1983~1987]
Owner/Contractor : SETAN + LİDER Engineering Co.Ltd. + DSİ
Spillway (1291 m³/s)
Grouting Gallery Beneath the Dam Body
Duration : [1983~1987]
Owner/Contractor : SETAN + LİDER Engineering Co.Ltd. + DSİ
Spillway (1291 m³/s)
Grouting Gallery Beneath the Dam Body