Duration : [1998 – 2012 ]
Owner/Contractor : SETAN + LİMAK Engineering Co. Ltd. + DSİ
Diversion Tunnel (4,50 m Dia, 492 m Long)
Spillway (1390 m³/s)
Bottom Outlet
Duration : [1998 – 2012 ]
Owner/Contractor : SETAN + LİMAK Engineering Co. Ltd. + DSİ
Diversion Tunnel (4,50 m Dia, 492 m Long)
Spillway (1390 m³/s)
Bottom Outlet